OMIS reliability: beyond the load test
The load test is a crucial phase in verifying the reliability of a system, taking it to the extreme limit of use before it is put into service. This strict test is essential to ensure the structural strength and correct operation of the system beyond its rated capacity, which in this case is 75 tonnes.
During this phase, the system is subjected to conditions that simulate the intense use and stresses it may face during its life cycle, ensuring that each component meets the expected safety and performance standards.
How many litres of water are inside these two balloons?
a) 75,000 litres
b) 87,658 litres
c) 93,000 litres
d) 98,736 litres
This meticulous attention to detail is what sets OMIS apart in the design and construction of lifting and handling systems, ensuring high and recognised quality.
We offer high performance, increased security and reliable performance over time, providing tailor-made solutions that exceed expectations.